Boat Construction

Cardboard boat construction continues here in the shop, although it looks as though my seniors will not finish their boat during this week, which is actually their last week of school. We have welcomed them to come back anytime to finish up their boats, which we hope they do. The Junior boat is coming together very well, with just one more exterior skin piece to place before they can begin working on the interior. There is still a lot of work to be done to seal the boat, but they still have about 3 weeks to go until the competition. A few progress photos of the boats.

Premier League

Spent most of the morning watching the Premier League final day action. Was hoping Leeds would find a way to stay up, and with a lot of luck they did. Good to have an American couch in the Premier League, but it will be interesting to see how long he stays there. I washed Simon, even as thunder and lightning was flashing above. A bit strange as I did not see heavy clouds and there was no rain. Worked out as well, and did some more work cleaning my workshop.

Cleaning

This morning I woke up early in order to get some supplies at Home Depot and hit the grocery store before the day became too busy. Just needed some spray paint and outlet covers at Home Depot, and wanted some food items for the weekend for grilling. Ferg and I began cleaning our my workroom downstairs, but after a few hours we were far from finished with the job. Decided to use my beer can stand and grill a chicken in the Kamado, however, my Kamado Jr. was not big enough to fit the chicken, so I ended up doing it in the oven. Still good.

Sign

It has taken quite a while to come together, but Senior Myles Y has nearly completed the large metal sign that will hang on the wall outside our shop. The CAD required was fairly complex, and was mostly done in Inkscape. He had to break our logo down into 4 equal parts, plus a center part to make everything fit on our waterjet, which was the machine used to cut each piece. There were a lot of hiccups, and the waterjet can be a temperamental machine at times, so there were a few stop and go moments on this project. Still, Myles persevered and we put up most of the pieces of the sign today and it looked great. There is a plan to add LED lighting on the back, but that will most likely fall on a different student next year as Myles is graduating. A few photos of the project below.

Robotics Club

I completely forgot to post about the Robotics Club, which Mr. Christy and myself are the moderators. To be fair, Mr. Christy spends much more time with the students, often staying until 8 or 9pm with them during the buildup to a recent contest. This year, the team participated in the MATE ROV competition, which is an underwater rover robot event. The event was at the Massachusetts Maritime Academy on the Cape, and we were there early in the morning. The contest was a little disorganized, and the start time was quite delayed. But that gave our team plenty of time to prepare and organize, since this was our first time at the event. We had two stints in the water with the robot, and the team learned a great deal from the day. Fortunately, we won! Out of the 4 scoring categories, we took 3 of them. We were completely surprised, but very happy for our students.

This means the team will now compete in the international event held in Long Beach, California. Mr. Christy has spent a lot of energy working on corporate sponsorship, and at this time we have raised nearly $20,000 to get the team to California, as well as created ongoing sponsorships for years to come. It’s been a great success, and no matter what happens in Long Beach, the team is going to get better and better each year. Unfortunately, neither myself or Mr. Christy will be able to attend the event in California, so a couple of parent chaperones will go with our team. I’ve posted a few photos below of the team and the rover. Unfortunately, it is very difficult to get any good video of the rover underwater!